MENU
 

Insights & Tips Archive


Fuse Distribution in a Majortel Power System

Majortel 48Vdc Power System: MTS48/30FL-1U This power system is designed with the integrated GMT load fuse distribution bay, front access visual indication when a fuse is open.  The battery circuit breaker, integrated for maintenance convenience, is located on the front, next to the fuse distribution.  The circuit breaker separates the battery connection from the core rectifier and load bus when open.  The circuit breaker operates independently from the low voltage disconnect (LVD) that is p...


August 02, 2018 | Product News, Technical Info, | read more...